Safety being a high priority on all of Breeze projects, all proper precautions are ensured to be installed prior to the commencement of demolition which range from installing a construction fence around the project site to create a controlled access zone and eliminate unauthorized personnel from entering the job to erecting a scaffolding to surround a building. In which all these protective measures are to ensure surrounding public safety. The projects specific means and methods are designed by Breeze’s in-house Professional Engineer, who studies the structures and determines the safest and most effective way to demolish a structure.
Breeze National Inc. believes in accident prevention through training to minimize the potential for injuries, lower workers’ compensation costs and reduce liability to both Breeze and its clients. Corporate policy dictates that safe operations must always take precedence over cost and expediency issues. Breeze is committed to making health and safety its number one priority. Every Breeze project, large or small, is engineered for safety. Every employee receives training to ensure the very best safety awareness.
Breeze National Inc. maintains a detailed Safety Manual specifically designed to provide maximum protection for all operations. Principle elements of this safety program include:
The program is continually updated to ensure compliance with current regulations and requirements. A copy of Breeze National Inc.’s manual is available for review upon request.
Copyright © 2024 Breeze National Inc. - All Rights Reserved.